Contact Form.

ShibataFenderTeam Group

Please calculate 6 plus 2.

* Mandatory fields

Your data will be used for the purpose of dealing with your enquiry and for marketing purposes. Your data will not be passed on to third parties and will only be handled internally at ShibataFenderTeam by authorized persons. We take the protection of your personal data very serious

Contact us

Shibata Fender Team

News.

Latest news about ShibataFenderTeam, orders and deliveries

ExxonMobil jetty in Norway refurbished with 25 modern SFT fender systems 

ExxonMobil’s Slagentangen refinery, located at the Oslo Fjord (Norway), was inaugurated in 1961. It currently receives ships up to 190,000t of deadweight and, every year, around 700 ships loaded with crude oil and petroleum products call at the port. Our team at the German office collaborated closely with our in-house engineering team to cope with this multi challenge project – design, engineering and Covid-19. They successfully managed to replace the fender systems and ensure smooth future berthing operations.    

The fender design was challenging as the dolphins, to which the fenders had to be installed, were different in their dimensions and the existing concrete was quite old and partly damaged. Also, the required stand-off distance was rather small, which posed a high demand for the design and installation of fenders, panels and chains. SFT overcame this challenge by integrating special tubes into the steel panels to mount the fenders to the steel panels without the need for additional flanges.   

Along with that, there were other obstacles like bollards, concrete blocks, moorings hooks, and other mooring equipment on the top deck of the quay wall, forcing our team of engineers to locate each bracket individually - all along the full length of the quay wall. This is one of our strengths: the SFT in-house engineering provides clients with specific and fully customized fender solutions.  

The 25 V Fender Systems (Arch Fenders, type SX-P 300) were delivered within a few months facing the last challenge: due to the Covid-19 situation, raw material availability and transportation endangered the on-time delivery. However, we managed to switch the production of the steel panels to our factory in Rechlin (Germany) and could provide the steel panels on time. This shows the great advantage of having production facilities on different continents: we are able to fully meet the requirements of our clients and their projects.  

As a true fender specialist, we are pleased to have contributed to a safer berthing process and would like to thank ExxonMobil very much for choosing SFT as their trusted partner for this amazing project. #4849 

More pictures of V Fenders for ExxonMobil can be found in our reference section.

Share
PreviousNext

Go back

Copyright © 2024. All Rights Reserved